Capital Project Delivery Lifecycle
Manage a construction project seamlessly from initial blueprint review and pre-construction bid...
- Sessions
- 17
- Steps
- 111
- Last edited
- Oct 25, 2026
- Created by
- Nova
About this process
A unified, end-to-end operational framework that guides construction projects seamlessly from initial blueprint review and pre-construction bid leveling through project management, field execution, and final financial closeout.
The process in detail
17 sessions · 111 steps📅 Meetings-Notes
2 steps- 1
Meeting Notes.
- 2
To-do list
Read the full text
1. Meeting Notes.
2. To-do list
1. Blueprint & Document Review
8 stepsReview project drawing sets across Architectural, Structural, and MEP disciplines to uncover constructability clashes, missing engineering details, and dimensional gaps. Your input directly shapes the formal Pre-Bid RFI log and ensures zero unverified assumptions enter our bid estimates.
- 1
Provide the complete drawing set (Architectural, Structural, MEP) and technical specifications.
- 2
📥 Audit Drawing Set Completeness
- 3
🔍 Identify Discipline Clashes & Discrepancies
- 4
⚠️ Evaluate Risk & Constructability Severity
- 5
📝 Compile Pre-Bid RFI Package
- 6
Schedule a meeting 🤝 MEETING 1: Constructability & Scope Review Meeting
- 7
Send the Design Team a formal written request for clarification or approval of a proposed solution.
- 8
📁 Publish Version-Controlled Drawing Register
Read the full text
1. Provide the complete drawing set (Architectural, Structural, MEP) and technical specifications.
2. 📥 Audit Drawing Set Completeness
Examine the tender package provided (step 1) to confirm all required sheets, disciplines, and engineering specifications are accounted for before starting detailed trade analysis.
Cross-reference your received file manifest against the drawing index on sheet G-001 or equivalent:
Upload the consolidated plan index or mark missing sheets and revisions that must be requested immediately (step 3).
3. 🔍 Identify Discipline Clashes & Discrepancies
Perform a structured cross-discipline overlay to identify spatial conflicts, misalignments, and constructability dead-ends between drawing sheets.
Examine high-risk interface points using this review framework:
Record each discovered clash or constructability issue as an individual entry. Detail the sheet numbers involved, specific grid coordinates, and the exact physical or dimensional conflict observed.
4. ⚠️ Evaluate Risk & Constructability Severity
Classify the overall severity and commercial risk level of the plan discrepancies identified during the cross-discipline scan.
Evaluate which trade interfaces pose the highest financial or schedule exposure if left unaddressed prior to bid closure:
Vote on the risk posture of the current drawing set and state in the comment which specific trade area carries the highest exposure.
- 🟢 Low Risk: Minor cosmetic or notes clarifications only
- 🟡 Moderate Risk: Dimensional discrepancies solvable via standard details
- 🔴 High Risk: Severe structural or MEP spatial clashes requiring engineering redesign
- 🛑 Critical Blocker: Missing core engineering sheets preventing accurate estimating
- ⚪ Zero Risk: Complete set verified, no RFIs required
5. 📝 Compile Pre-Bid RFI Package
Convert every documented drawing conflict, missing specification, and dimensional ambiguity into formal, contractual Pre-Bid Requests for Information (RFIs).
In commercial general contracting, our standard is zero bid-day assumptions. Every ambiguity must be framed with a specific question and a recommended contractor solution to expedite the architect or engineer's response.
Format your pre-bid RFI entries using this standard structure:
Draft each formal Pre-Bid RFI below so they can be merged directly into the master submission log for the design team.
6. Schedule a meeting 🤝 MEETING 1: Constructability & Scope Review Meeting
The Estimator, Lead Project Manager, and Field Superintendent gather to review the plan set together. The Superintendent brings real field experience (e.g., "We can't get a crane in here" or "This wall detail clashes with the steel HVAC duct"), which completes the list of RFIs before anything is finalized.
- 🟢 Meeting Completed — Plan Review Finished (Notes Captured in Session)
- 🟡 In Progress — Individual Review Complete, Team Meeting Scheduled
- ⚪ Skipped — Minor Project / Repeat Plan Set (PM/Estimator Sign-off Required)
- 🔴 Blocked — Missing Key Drawings / Unresolved Design Clashes
7. Send the Design Team a formal written request for clarification or approval of a proposed solution.
Send the Design Team (the Architect, Structural Engineer, or MEP Engineer, depending on who produced the specific drawing) a formal written request for clarification or approval of a proposed solution. This resolves drawing discrepancies, missing dimensions, or physical conflicts before construction or pricing moves forward. Update the status when the request is sent and when the response is received.
- 📤 Sent
- 📥 Received — Under Review
- 🔄 Received — Revisions Needed
- ✅ Approved — Proceed
8. 📁 Publish Version-Controlled Drawing Register
Establish the final baseline drawing repository and register to ensure all estimating estimators and bidding trade partners work from the exact same validated set.
Structure the baseline register with the following mandatory parameters:
Create a folder for this project. Upload the finalized Drawing & Addendum Log, add it to the folder, and link the version-controlled repository below to release the master set for quantity take-offs.
2. Quantity Take-Off & Scope Breakdown
10 stepsComplete the trade-by-trade quantity take-off and scope breakdown from the approved drawing set. You will apply CSI MasterFormat cost codes, calculate net quantities with explicit waste and contingency factors, establish crew productivity hours, and compile the final take-off schedule.
- 1
🔗 Master Project Excel Workbook & 2D Drawing Folder: Add Link Below
- 2
Calculate Net Trade Quantities
- 3
Assign CSI MasterFormat Codes
- 4
Apply Waste and Contingency Factors
- 5
🔒 Stage Gate 1: Quantity & CSI Code Verification (Manager Review)
- 6
Calculate Crew Labor Productivity Hours
- 7
Flag High-Risk and Long-Lead Items
- 8
Compile Final Scope Breakdown Schedule
- 9
🔒 Stage Gate 2: Master Scope & Budget Approval (Final Gate)
- 10
🔒 Stage Gate 2- Request 2: Master Scope & Budget Approval (Final Gate)
Read the full text
1. 🔗 Master Project Excel Workbook & 2D Drawing Folder: Add Link Below
Estimators will keep a 2D PDF drawing reader (like Bluebeam Revu or PlanSwift) open on one screen to measure dimensions, while having the Excel master estimating sheet open on their second screen to calculate line-item costs, labor hours, waste factors, and risk contingencies. Add both links here.
2. Calculate Net Trade Quantities
Extract primary geometric measurements directly from the current drawing set across all primary trade packages. Measure physical dimensions without adding hidden buffers or unit price inflation.
Use the standard geometric measurement units by trade:
Enter your net take-off quantities grouped by trade package. Note the drawing sheet references (e.g., A-101, S-201, E-002) used for each measurement.
- 🔴 Blocked — Missing Blueprint Sheets / Unreadable Plans
- 🟠 High Variance — Scale Discrepancy Found in Drawings
- 🟡 In Progress — Awaiting Missing Architectural / Structural Detail
- 🟢 Quantities Measured — Ready for CSI Coding
3. Assign CSI MasterFormat Codes
Organize each measured scope item into its standardized 6-digit CSI MasterFormat division and cost code. Standardized cost coding ensures flawless bid-leveling and seamless export into your project accounting software.
Map your scope entries to these common standard divisions:
Enter each scope item with its assigned 6-digit CSI code, trade description, and total net unit quantity.
- 🔴 Blocked — Scope Description Ambiguous / Undefined Material
- 🟠 Unmatched Code — Missing Division Category in Accounting System
- 🟡 Pending Classification — Non-Standard / Custom Specialty Scope Item
- 🟢 CSI Codes Mapped — Standard Divisions Complete
4. Apply Waste and Contingency Factors
Apply standard scrap and installation waste factors explicitly to your net measurements rather than padding labor rates or raw material costs. Never conceal contingency within base line items.
Use these industry standard waste formulas:
Select the contingency and waste protocol that best reflects the geometric complexity and site conditions of this project scope.
- 🟢 Standard Geometry & Tight Specs (3% Contingency, 5-8% Trade Waste)
- 🟡 Moderate Cutting & Irregular Layouts (4% Contingency, 8-10% Trade Waste)
- 🟠 Complex Architectural Plan / Heavy Waste (5% Contingency, 10-12% Trade Waste)
- 🔴 High-Variance / Incomplete Details (5% Contingency + RFI Verification Required)
5. 🔒 Stage Gate 1: Quantity & CSI Code Verification (Manager Review)
Gate check before senior estimators apply waste, labor hours, and pricing: Review previous steps.
- 🛑 Critical Error — Drawing Scale or Revision Mismatch
- 🔄 Revisions Required — Re-check Measurements / Codes in Excel
- ✅ Quantities & CSI Codes Verified — Proceed to Pricing
6. Calculate Crew Labor Productivity Hours
Convert gross material quantities into estimated labor man-hours using standard crew production rates. Accurate labor calculations prevent scope gaps when reviewing trade subcontractor proposals.
Apply the standard labor productivity formula:
Calculate and list the total estimated craft labor hours required for each CSI trade division based on your gross material take-offs.
- 🔴 Blocked — Missing Gross Material Quantities
- 🟠 High Labor Risk — Complex Site Access / Overtime Expected
- 🟡 Pending Verification — Non-Standard Crew Rate / Union Labor Review
- 🟢 Labor Hours Calculated — Standard Production Rates Applied
7. Flag High-Risk and Long-Lead Items
Identify materials, custom fabrications, and imported finishes that present severe supply chain vulnerabilities or critical path schedule risks. Flagging these items during pre-construction ensures procurement begins immediately upon bid award.
Review your take-off against standard high-risk construction categories:
Record each flagged item using this structure:
- 🔴 Blocked — Lead Times Unconfirmed by Suppliers
- 🟡 Alternate Vendor Needed — Substitution Required to Meet Schedule
- ⚠️ High Risk Flagged — Critical Path Item (12–24+ week lead time)
- 🟢 Risk Audit Complete — All Standard Lead Times (under 6 weeks)
8. Compile Final Scope Breakdown Schedule
Synthesize your calculations into the master Quantity Take-Off & Scope Breakdown Schedule. This document serves as the internal pricing baseline for issuing subcontractor bid packages and evaluating trade quotes.
Format your take-off schedule using this required five-column line item structure:
Publish the completed schedule in your note below to establish the baseline for subcontractor bid leveling and procurement tracking.
- 🔴 Blocked — Outstanding Line-Item Revisions
- 🟡 Draft Complete — Minor Allowance Reconciliation Pending
- 🚀 Schedule Fully Compiled — Ready for Final Master Gate
9. 🔒 Stage Gate 2: Master Scope & Budget Approval (Final Gate)
- ❌ Bid On Hold — Client Scope Pause / Project Delay
- 🔄 Adjust Pricing / Contingencies — Send Back to Estimator
- 🚀 Final Sign-Off — Approved to Release Package to Subcontractors
10. 🔒 Stage Gate 2- Request 2: Master Scope & Budget Approval (Final Gate)
- ❌ Bid On Hold — Client Scope Pause / Project Delay
- 🔄 Adjust Pricing / Contingencies — Send Back to Estimator
- 🚀 Final Sign-Off — Approved to Release Package to Subcontractors
3. Sub-Contractor Bid Solicitations
8 stepsReview trade solicitation packages, verify pre-bid site walk attendance, and level subcontractor quotes line by line. Identify scope gaps, reconcile inclusions and exclusions, and select the winning trade partners to protect project margin.
- 1
Audit Trade Bid Solicitations
- 2
Audit Trade Bid Solicitations: Overview
- 3
Confirm Pre-Bid Walk Attendance
- 4
Normalize Trade Scope Inclusions
- 5
Compare Unit Rates and Labor
- 6
Select Winning Trade Subcontractors
- 7
🔒 STAGE GATE: Subcontractor Award Approval (Project Executive / Director Sign-off)
- 8
Generate Subcontract Award Packages
Read the full text
1. Audit Trade Bid Solicitations
Before opening quotes, verify that every trade division solicited at least three qualified, vetted subcontractors. Construction risk escalates when single-sourcing trades or accepting bids from contractors without verified safety records and pre-qualification status.
Review your invitation list across key CSI MasterFormat divisions (e.g., Division 03 Concrete, Division 05 Metals, Division 09 Finishes, Division 22 Plumbing, Division 26 Electrical)
2. Audit Trade Bid Solicitations: Overview
Flag any division that has fewer than three committed bidders so estimating can solicit immediate backup coverage before the bid deadline.
- 🔴 Critical Non-Compliance — Unvetted/Unlicensed Subcontractors or Plan Version Mismatch
- 🟠 Coverage Gap — Prequalified Bidders, but Fewer Than 3 Bids in Certain Trades
- 🟡 Prequalification Pending — 3+ Bidders, but Safety/License/Bonding Docs Incomplete
- 🟢 Fully Verified & Compliant — 3+ Bidders, All Prequalified, Identical Plans
3. Confirm Pre-Bid Walk Attendance
Subcontractors who do not physically inspect existing site conditions introduce unbudgeted change orders once work commences. A mandatory pre-bid site walk ensures trade leads inspect logistical constraints, staging limitations, utility access, and demolition boundaries.
Check site walk records against bidder submissions:
Select the status of pre-bid site walk verification across all bidding trades.
- 🟢 All bidders attended and acknowledged site conditions
- 🟡 Some bidders missed walk; supplemental walks or waivers required
- 🔴 Critical trades missed walk; high risk of unforeseen condition claims
4. Normalize Trade Scope Inclusions
Raw quote totals are deceptive because subcontractors frequently exclude necessary support work. Level each trade quote line by line against the defined Scope of Work package to establish true baseline comparisons.
Examine quotes across these recurrent scope gap zones:
Draft the trade scope reconciliation matrix below. Note every item one bidder included that another excluded, along with the estimated plug number needed to balance them.
5. Compare Unit Rates and Labor
When base bids look competitive, differences in labor composition, shift premiums, and unit change-order rates can erode profit margins during construction.
6. Select Winning Trade Subcontractors
Select the approved trade partner award recommendation based on fully leveled comparisons, scope completeness, safety qualifications, and confirmed schedule commitments.
*Choose and option & add note: Choose the contracting recommendation status for this package and detail the winning subcontractors with agreed contract values in your rationale.
- 🏆 Award to primary low leveled bidder (all scopes confirmed)
- ⚖️ Award to higher bidder due to schedule and qualification advantages
- 🔄 Re-scope and re-solicit specific trade division before award
7. 🔒 STAGE GATE: Subcontractor Award Approval (Project Executive / Director Sign-off)
- 🛑 Rejected — Select Alternate Subcontractor
- 🔄 Revisions Required — Re-level Trade Bids or Renegotiate Pricing
- ⚠️ Approved with Conditions — Proceed with Value Engineering / Scope Adjustments
- 🚀 Approved — Issue Subcontract Award Package
8. Generate Subcontract Award Packages
Compile the finalized subcontractor selection sheet into binding award packages to prepare for project buyout and subcontract drafting.
Your award summary must detail:
Document the finalized trade awards below. This log serves as the direct handover to project management for contract issuance and procurement tracking.
4. Proposal Generation & Client Contract Signing
9 stepsCompile and review the final cost structure, establish finish allowance schedules, and finalize the binding construction proposal for client execution. Use this session to verify margin protection, secure contract sign-off, confirm deposit receipt, and initiate permit registration.
- 1
Proposal Generation & Client Contract Draft
- 2
📊 Document the compiled cost summary below, listing direct hard costs, general conditions, contingency, and net margin percentage.
- 3
🏷️ List all finish allowance categories below with their respective dollar limits and labor scope parameters.
- 4
🗓️ Outline the major milestone target dates and critical path assumptions to be embedded directly into Exhibit B of the Prime Contract.
- 5
🔍 Audit Margin and Contract Risks
- 6
📄 Finalize Prime Contract Package
- 7
✍️ 📥 Download & Review: Download and review the attached Prime Contract Package and project proposal.
- 8
✍️ Track Contract Execution and Permitting
- 9
📋 Transition to Project Setup
Read the full text
1. Proposal Generation & Client Contract Draft
[Get access to the main folder here]
2. 📊 Document the compiled cost summary below, listing direct hard costs, general conditions, contingency, and net margin percentage.
3. 🏷️ List all finish allowance categories below with their respective dollar limits and labor scope parameters.
4. 🗓️ Outline the major milestone target dates and critical path assumptions to be embedded directly into Exhibit B of the Prime Contract.
5. 🔍 Audit Margin and Contract Risks
Perform an internal executive pre-issuance check to verify that contract language, escalation clauses, and margin boundaries meet company risk guidelines.
Review the proposed terms against these four non-negotiable protections:
Vote on the risk readiness of the proposal package and record any required contract stipulations.
- 🟢 Approved without modifications: contract margins and terms are protected
- 🟡 Conditional approval: requires tightened allowance caps or escalation language
- 🔴 Hold issuance: pricing gaps, low margin threshold, or unmitigated risk identified
6. 📄 Finalize Prime Contract Package
7. ✍️ 📥 Download & Review: Download and review the attached Prime Contract Package and project proposal.
Please review the attached Prime Contract Package below. Once approved, download the document, sign it, and re-upload the signed copy to formally finalize the contract and authorize project mobilization.
- Approve
- Request changes
- Decline
8. ✍️ Track Contract Execution and Permitting
Confirm formal execution of the Prime Contract, verify receipt of the initial project mobilization deposit, and launch the municipal permit application.
Follow this checklist to confirm the transition from pre-construction to active project management:
Confirm the execution status by selecting the appropriate stage below, adding the deposit receipt reference and permit tracking ID in your comments.
- ☑️ 📝 Contract fully executed by client and GC
- ☑️ 💵 Initial mobilization deposit received and cleared
- ☑️ 🏛️ Building permit application submitted to municipality
- ☑️ 🚀 All execution gates closed: ready for Department 2 Project Setup
9. 📋 Transition to Project Setup
Deliver the final handoff plan transitioning the executed contract into Department 2: Project Management (Project Setup & Sub-Contractor Contracting).
Summarize the four core handoff parameters based on the executed agreement:
Record the transition summary below as the official baseline for the Project Setup session.
5. Project Setup & Sub-Contractor Contracting
5 stepsReview and execute the sub-contractor contracting and compliance gate for this project. You will lock in baseline CSI budget codes, verify executed trade agreements with required legal clauses, and validate active Certificates of Insurance and safety plans before authorizing site access.
- 1
📊 Lock Baseline Cost Codes
- 2
📝 Audit Sub-Contractor Agreement Clauses
- 3
🛡️ Verify COIs and Endorsements
- 4
👷 Enforce Safety Compliance Policies
- 5
🛑 Issue Site Mobilization Clearances
Read the full text
1. 📊 Lock Baseline Cost Codes
Convert the winning estimate into active project cost codes to establish your baseline budget before commitments are issued.
Ensure each line item matches the standard CSI MasterFormat division structure, and verify that indirect general conditions and contingency accounts are isolated from direct trade labor and material lines.
Review the budget conversion rules:
Confirm that all line items match the signed Prime Contract Schedule of Values, and select the status that reflects your budget setup.
- 🟢 Baseline cost codes locked and balanced
- 🟡 Minor cost code adjustments pending
- 🔴 Estimate-to-budget variances require correction
2. 📝 Audit Sub-Contractor Agreement Clauses
Examine every Sub-Contractor Agreement draft against our mandatory project terms before sending out for execution.
A valid agreement protects project margin, guarantees delivery milestones, and enforces statutory compliance. Verify that each contract contains these essential exhibits:
List any customized trade inclusions, exclusions, or modified contract terms for each critical trade partner. React with 👍 once each trade package is ready for signing.
3. 🛡️ Verify COIs and Endorsements
Inspect incoming Certificates of Insurance (COI) from each trade partner against our standard contract limits and underwriting standards.
A missing endorsement exposes the general contractor to direct liability claims. Check each certificate against this risk matrix:
Upload the verified COI documents, endorsements, and preliminary lien waivers here.
4. 👷 Enforce Safety Compliance Policies
Validate trade partner safety submissions to ensure complete OSHA alignment prior to site mobilization.
Zero tolerance applies to high-risk trades operating without validated training certifications or site-specific safety plans. Review each submission for:
Rate the readiness of incoming trade safety programs using the options below.
- 🟢 Fully compliant with all certifications and signed policies
- 🟡 Conditional approval pending specific equipment certifications
- 🔴 Non-compliant: missing safety plan or signed acknowledgment
5. 🛑 Issue Site Mobilization Clearances
Execute the final readiness gate to authorize or deny site mobilization for each contracted trade partner.
Enforce the ironclad project rule: No trade partner steps foot on site without an executed agreement, verified active insurance, and a signed safety policy.
Assign the definitive onboarding clearance actions to the project team for site operations handoff.
6. Client Material & Finish Selection Management
10 stepsReview and lock in all client finish and fixture selections against project allowances and lead-time cutoff dates. You will curate spec options, track cost deltas, log physical sample approvals, and trigger purchase orders before fabrication deadlines impact the master schedule.
- 1
🗓️ Map Selections Schedule & Cutoff Gates
- 2
Create a document with a calendar schedule showing the deadlines for when decisions need to be made.
- 3
Next steps
- 4
Draft Curated Finish Options & Insert Portfolio Links
- 5
Present Curated Options for Client Review & Link Selection
- 6
Finalize Selection & Approve Option (Upgraded Option — B or C)
- 7
Finalize Selection & Approve Option (Baseline Option — A)
- 8
Next steps
- 9
✍️ Secure Material Selection Sign-Off
- 10
🚀 Issue Procurement Purchase Orders
Read the full text
1. 🗓️ Map Selections Schedule & Cutoff Gates
Establish lead-time cutoff dates for every finish and fixture category by working backward from site installation milestones on the master schedule.
Use this backward-scheduling formula:
Cutoff Date = Installation Date - (Supplier Lead Time + Shipping/Customs Buffer + Job Site Acclimatization)
Standard trade benchmark buffers:
Document the finish packages, their target delivery dates, supplier lead times, and client decision cutoff gates.
2. Create a document with a calendar schedule showing the deadlines for when decisions need to be made.
Also add a table indicating the GC/Project Manager calculates the "drop-deadline date" (Cutoff Gate) by which a material must be chosen so it arrives on-site on time.
3. Next steps
4. Draft Curated Finish Options & Insert Portfolio Links
Provide a curated proposal featuring Option A, along with Option B or Option C. Option A must strictly align with the original contract budget allowance previously established. Options B and C represent upgrades or alternative specifications; simply include the direct links to each option package.
5. Present Curated Options for Client Review & Link Selection
Review the curated options provided below:
To review the full specifications for any package, click the corresponding link.
- Option A (Baseline): [ NAME ] [Trade & Cost Code]
- Option A (Baseline): [ NAME ] [Trade & Cost Code]
- Option A (Baseline): [ NAME ] [Trade & Cost Code]
6. Finalize Selection & Approve Option (Upgraded Option — B or C)
Return to the previous step and uncheck any options that were not chosen. Ensure only your single, final selection remains marked as selected.
You have selected an upgraded package (Option B/C). By approving this selection, you acknowledge and accept responsibility for the projected budget overage resulting from this choice.
- Approve
- Request changes
- Decline
7. Finalize Selection & Approve Option (Baseline Option — A)
Return to the previous step and uncheck any options that were not chosen. Ensure only your single, final selection remains marked as selected.
You have selected the baseline package (Option A). By approving this selection, you confirm that your contract budget allowance remains unchanged.
- Approve
- Request changes
- Decline
8. Next steps
9. ✍️ Secure Material Selection Sign-Off
Indicate the client approval status for the presented finish schedules, specification cut sheets, and material cost deltas.
Selecting an option confirms whether the material specifications have received binding client authorization to proceed into procurement:
State the specific package approved and note any agreed cost adjustments in the comment field.
- ✅ Approved with signed cut sheets & cost deltas
- ⚠️ Conditionally approved pending final dye lot/shade verification
- 🔄 Re-selection requested (schedule impact notice issued)
- ❌ Rejected by client
10. 🚀 Issue Procurement Purchase Orders
Execute vendor purchase orders, lock in committed shipping dates, and update material tracking logs to eliminate site mobilization delays.
Execute the following actions:
6.1 Change Order & Financial Management
7 stepsLog field scope deviations and client alteration requests, calculate true cost and schedule impacts, and generate the formal Change Order package. Use this workflow to eliminate verbal authorizations and secure binding client approval and payment terms before any extra work begins.
- 1
📋 Classify Scope Deviation Origin
- 2
🔍 Attach all supporting files inside this folder.
- 3
💰 Calculate True Cost Delta
- 4
⏱️ Quantify Critical Path Schedule Impact
- 5
📄 Generate Formal Change Order Package
- 6
🚫 Enforce Authorization Protocol
- 7
🚀 Release Execution & Subcontractor Directives
Read the full text
1. 📋 Classify Scope Deviation Origin
Identify the trigger and root cause behind the proposed change order. Accurate classification ensures proper risk allocation, contractual entitlement, and transparent client communication.
Review the situation against standard construction categories:
Select the origin category and record the specific drawing sheet, RFI reference, or site incident in the comments.
- 🎨 Client-Requested Modification
- 🕳️ Unforeseen Concealed Site Condition
- 📐 Plan Discrepancy / Design Conflict
- 🏛️ Municipal Code / Inspector Mandate
2. 🔍 Attach all supporting files inside this folder.
🔍 Detail Field Scope & Site Evidence: Document the exact physical scope of work required and attach substantiating field documentation. Zero unverified claims are permitted. Upload photos showing clear scale (tape measure or reference object in view), marked-up drawing redlines, engineer field reports, or inspector notice slips.
3. 💰 Calculate True Cost Delta
Build the complete financial calculation for the proposed change order. Never bury contingency inside unit prices; show transparent line-item pricing across all direct and indirect expense categories.
Apply this General Contractor pricing structure:
Log the calculated line-item breakdown, sub-tier quotes, and the net lump-sum change to the contract value.
4. ⏱️ Quantify Critical Path Schedule Impact
Determine whether this change directly affects the project critical path or can be absorbed within available float. Adding work without updating calendar duration compromises milestone delivery dates.
Evaluate the schedule delta using this calculation checklist:
Select the schedule impact bracket that applies to this change order and state the exact net calendar day adjustment in the comments.
- ⚡ 0 Days (Absorbed by Float / Parallel Task)
- 📅 1 to 5 Calendar Days Added
- 🗓️ 6 to 15 Calendar Days Added
- 🚨 16+ Calendar Days Added (Critical Delay)
5. 📄 Generate Formal Change Order Package
Compile the official General Contractor Change Order document (such as standard AIA Document G701 or company Master Agreement format) for distribution.
The change order package must strictly contain:
Upload the finalized change order PDF document ready for client review.
6. 🚫 Enforce Authorization Protocol
Enforce the project-wide "Zero Verbal Change Orders" policy. No field superintendent, trade foreman, or project manager may instruct trade crews to commence unapproved extra work based on verbal agreements or text messages.
Before releasing work in the field, verify that all four mandatory authorization criteria are satisfied:
Confirm the authorization status of this change order. Selecting fully authorized releases field execution.
- 📝 Draft / Under Internal Review
- ⏳ Pending Client Signature & Deposit
- ✅ Fully Executed (Authorized to Proceed)
- ❌ Rejected / Scope Abandoned
7. 🚀 Release Execution & Subcontractor Directives
Once authorization is confirmed, transition the change order from commercial management into active field operations. Assign clear owners and deadlines to prevent operational friction.
Create specific tasks to complete the change order rollout:
Assign each task to the responsible project manager or field superintendent with firm completion dates.
🔄 8. Progress Billing & Application for Payment
6 stepsExecute the monthly client progress billing workflow by auditing on-site progress against the Schedule of Values, reconciling trade pay applications and lien waivers, and compiling the AIA G702/G703 billing package. Submit the complete application with photographic backup for architect certification and client disbursement.
- 1
Audit Physical Progress Against SOV
- 2
Reconcile Subcontractor Applications & Waivers
- 3
Upload Progress Photos & Delivery Slips
- 4
Compile AIA G702 & G703 Application Package
- 5
Verify Billing Quality & Compliance Gates
- 6
Approve & Issue Payment Package
Read the full text
1. Audit Physical Progress Against SOV
Conduct the end-of-month physical progress walk across all active trades to confirm percentage-of-completion before drafting billing figures.
Evaluate physical work in place against the approved Schedule of Values (SOV) line items. Overbilling without field verification triggers architect rejections, pencil-copy disputes, and cash flow delays.
Apply standard progress calculation logic:
Mark the audit status for each trade phase to ensure complete field alignment prior to compiling pay applications.
- ✅ Field progress verified against SOV line items
- ⚠️ Discrepancy noted between trade claim and physical installation
- 📦 Stored materials inspected and documented on site
- 🔄 Pencil copy draft reviewed with Project Superintendent
2. Reconcile Subcontractor Applications & Waivers
Review each active trade contractor's monthly payment application against inspected field progress and verify legal compliance documents.
Never advance a subcontractor billing line into the prime billing package without verifying both the math and statutory lien releases:
Record any required downward adjustments or missing lien waivers in the log below so adjustments can be reflected on the draft G703.
3. Upload Progress Photos & Delivery Slips
Attach date-stamped photographic evidence and delivery documentation supporting every major progress milestone claimed this cycle.
Architects, owners' representatives, and bank draw inspectors require clear visual proof before certifying payment applications:
Add all supporting visual documentation and delivery slips here.
4. Compile AIA G702 & G703 Application Package
Assemble the formal AIA Document G702 (Application and Certificate for Payment) and AIA Document G703 (Continuation Sheet).
Verify the core accounting reconciliation across all summary lines on the G702 summary page:
Upload the compiled draft PDF of the G702 and G703 forms, accompanied by the notarized signature sheet.
5. Verify Billing Quality & Compliance Gates
Execute the final quality control gate to verify that every legal, mathematical, and contractual requirement is fulfilled prior to release.
Work through the standard GC payment compliance checks:
Confirm each verification item below.
- 🧮 G702 and G703 mathematical reconciliation confirmed
- 📝 Notarized contractor signature executed on G702
- 📑 All active trade conditional lien waivers collected
- 📸 Photographic audit package attached to submittal
- 📋 Change order summary aligns with executed contract modifications
6. Approve & Issue Payment Package
Authorize the final submission of the monthly Application and Certificate for Payment to the Project Architect and Client.
Review the assembled package:
Approve to release the official draw submittal to the design team and ownership, or decline with specific correction notes regarding discrepancies in SOV percentages, lien documentation, or calculations.
- Approve
- Request changes
- Decline
Milestone 1: Site Mobilization & Safety Setup
6 stepsVerify jobsite infrastructure, establish safety and environmental controls, and conduct the trade orientation kickoff. Complete these verification steps to authorize heavy equipment delivery and initial trade crew mobilization.
- 1
Verify Temporary Utilities & Site Infrastructure
- 2
Audit Environmental Controls & Stormwater
- 3
Post OSHA Signage & Safety Stations
- 4
Document Trade Superintendent Kickoff Meeting
- 5
Execute Pre-Mobilization Action Items
- 6
Authorize Site Mobilization & Trade Access
Read the full text
1. Verify Temporary Utilities & Site Infrastructure
Establish physical perimeter control and temporary utility connections before allowing field operations to commence.
Inspect each infrastructure element against local municipal building codes and OSHA standards:
Select your current infrastructure verification status and note any utility provider lead times or inspection delays.
- 🏗️ All Utilities & Security Fencing Active
- ⏳ Pending Utility Meter Connection
- ⚠️ Fencing or Sanitary Incomplete
- 🛑 No Site Infrastructure In Place
2. Audit Environmental Controls & Stormwater
Review and activate the project's Stormwater Pollution Prevention Plan (SWPPP) and site environmental mitigation controls.
Ensure all mandated regulatory safeguards are active prior to earthwork or site disturbance:
Document any field variances or municipal SWPPP permit conditions that require daily logging.
3. Post OSHA Signage & Safety Stations
Verify all mandatory federal, state, and local safety compliance stations are mounted and accessible across the field office and jobsite entry gates.
Inspect against this life-safety standard:
Indicate compliance status for site life-safety setup.
- 🦺 100% OSHA Signage & Medical Stations Ready
- 📋 SDS Binder or Posters Pending Update
- 🧯 Fire Extinguishers / First Aid Deficient
- 🛑 Safety Compliance Walk Failed
4. Document Trade Superintendent Kickoff Meeting
Conduct the mandatory on-site mobilization kickoff meeting with all contracted trade superintendents, foremen, and project engineers.
Walk through these critical coordination topics:
Log the meeting minutes, record attending trade companies and superintendents, and list all agreed jobsite logistics agreements here.
5. Execute Pre-Mobilization Action Items
Complete all assigned operational tasks before clearing subcontractors to bring machinery or full labor crews onto the site.
Assign specific team owners and firm due dates to ensure zero regulatory or physical bottlenecks remain.
6. Authorize Site Mobilization & Trade Access
Issue the formal determination on site readiness for full trade mobilization.
Review the preceding verifications: temporary utilities energized, perimeter secured, SWPPP sediment controls trenched, OSHA compliance stations mounted, and trade kickoff orientations conducted.
Select the authorized site access level. Use the comment box to specify any conditional holdbacks (e.g., Site cleared for framing and excavation crews; mechanical rough-in staging restricted until east laydown pad gravel cures).
- 🟢 Full Mobilization Authorized (Unrestricted Site Access)
- 🟡 Conditional Mobilization (Specific Trades Only)
- 🔴 Site Mobilization Denied (Safety / Utility Hold)
Milestone 2: Daily Execution & Quality Assurance Inspections
5 stepsLog your daily field operations, morning safety briefings, trade inspections, and photo documentation directly in this session. Your submissions create the verified chronological record of job site progress, subcontractor quality control, and pre-concealment sign-offs.
- 1
🦺 Conduct Morning Toolbox Talk
- 2
📋 Log Daily Site Conditions & Headcounts
- 3
🔍 Audit In-Progress Trade Work
- 4
📸 Verify Pre-Concealment Photo Records
- 5
📌 Execute Daily Field Closeout Tasks
Read the full text
1. 🦺 Conduct Morning Toolbox Talk
Run the mandatory morning safety and production stand-up with all active trade foremen prior to work commencing.
Brief the specific high-risk operations scheduled for today (such as hot work, overhead lifting, trenching, or leading-edge fall protection), verify required Personal Protective Equipment (PPE) compliance across all crews, and confirm site logistics including crane delivery staging and material drop zones.
Select the primary safety focus addressed during this morning's briefing:
- 🦺 Fall Protection & Scaffolding
- ⚡ Electrical Safety & Lockout/Tagout
- 🚜 Trenching, Excavation & Heavy Equipment
- 🔥 Hot Work, Fire Watch & Burn Permits
- 🧤 PPE, Silica Dust & Chemical Handling
- 📦 Overhead Hazards, Rigging & Crane Logistics
2. 📋 Log Daily Site Conditions & Headcounts
Record the official job site operational parameters to establish a verifiable legal and contractual record of daily site activity.
Capture the following operational baseline:
Provide your comprehensive daily operational notes below.
3. 🔍 Audit In-Progress Trade Work
Inspect ongoing trade work against approved construction submittals, architectural and structural drawings, and manufacturer installation specifications.
Evaluate current installations across these core quality dimensions:
Identify any deviations, non-conforming items, or defective workmanship. Record the trade responsible, grid line or room location, specific code/plan discrepancy, and the mandatory corrective action required within 24 hours.
4. 📸 Verify Pre-Concealment Photo Records
Capture photographic proof of all mechanical, electrical, plumbing, structural framing, and waterproofing work before it is permanently concealed by insulation, drywall, backfill, or concrete pours.
High-resolution pre-concealment documentation prevents future warranty disputes and provides clear evidence of code compliance for municipal building inspectors and owners.
Upload clear photos of all in-wall rough-ins, above-ceiling mechanical rough-ins, under-slab conduits, and waterproofing membranes prior to sign-off. Ensure photos capture room markers, grid references, and backing plates.
5. 📌 Execute Daily Field Closeout Tasks
Complete the end-of-day site protocol to ensure physical security, environmental compliance, and complete accountability before trade crews depart the property.
Assign and verify the mandatory end-of-day site handover items:
📅 1.1. Meeting: Constructability & Scope Alignment
7 stepsReview and evaluate physical site logistics, interdisciplinary drawing clashes, schedule lead times, and environmental safety hazards (as a team: Estimator, PM, Superintendent) to align on site logistics, crane access, and drawing clashes before publishing the RFI package and before committing estimating resources. Work through each critical section with the project team and select the constructability status for each domain. Use your findings to resolve the final Master Gate decision to release, condition, or hold the estimating workflow. If this project qualifies for an expedited path, select Skipped and provide the operational justification below. [ Add link to main folder with documents here]
- 1
🏗️ Evaluate Site Logistics & Access
- 2
📐 Screen Drawing Clashes & Scope Gaps
- 3
⏱️ Assess Phasing, Schedule & Long-Lead Items
- 4
🦺 Identify Safety & Hazardous Conditions
- 5
Other Notes
- 6
🚦 Resolve Master Gate Status
- 7
Photos or files
Read the full text
1. 🏗️ Evaluate Site Logistics & Access
Evaluate whether physical equipment, materials, and crane operations can be mobilized without disrupting surrounding municipal traffic or adjacent operations. Review project boundaries, street widths, municipal right-of-way restrictions, and overhead utility lines against your proposed staging plan.
Focus your evaluation on these core logistics factors:
Select the current logistics status below, and log any required permit triggers or JIT delivery constraints in the comment field.
- 🟢 Logistics Cleared — Standard site access with no major physical constraints
- 🟡 Tight Staging — Limited space; requires off-site storage or just-in-time deliveries
- 🔴 High Risk / Restricted — Crane permits, road closures, or zero laydown space required
2. 📐 Screen Drawing Clashes & Scope Gaps
Examine interdisciplinary drawing alignment across Architectural, Structural, Civil, and MEP/FP sheets to isolate constructability conflicts before pricing.
Identify hard spatial clashes and ambiguous details that introduce bid scope gaps or change-order exposure during field execution.
Audit the drawing set against these common failure points:
Select the drawing risk classification below, and cite the specific drawing sheet numbers and conflicting details in your rationale comment.
- 🟢 Clean Drawing Set — Minor or no trade clashes identified
- 🟡 RFIs Drafted — Clashes identified; preliminary pre-bid RFIs created for architect review
- 🔴 Critical Redesign Required — Major structural or MEP conflict that blocks accurate estimating
3. ⏱️ Assess Phasing, Schedule & Long-Lead Items
Analyze whether baseline project milestones are achievable within existing lead times, site operating rules, and local jurisdictional ordinances.
Compare anticipated manufacturing and shipping cycles for critical-path equipment against the client's mandatory completion date.
Examine schedule integrity against these four operational parameters:
Select the schedule feasibility status below, and note all components whose fabrication cycles threaten the baseline delivery date.
- 🟢 Schedule Feasible — Standard construction sequence and lead times
- ⚠️ Long-Lead Flagged — Critical path materials require early procurement or owner pre-purchase
- 🔴 Schedule Compression Risk — Unrealistic timeline; liquidated damage exposure
4. 🦺 Identify Safety & Hazardous Conditions
Assess severe project safety risks, neighboring structural dependencies, and environmental contaminants that mandate specialized engineering controls or regulatory plans.
Review site soil reports, hazardous material surveys, and surrounding building alignments to prevent catastrophic field failures and regulatory stoppages.
Examine the scope against these specialized safety categories:
Select the safety classification below, and state any mandatory engineered safety plans, subcontractor certifications, or third-party monitoring requirements.
- 🟢 Standard Safety Risk — Baseline safety controls apply
- 🟡 Specialty Safety Required — Deep excavations, confined spaces, or high-voltage work identified
- 🔴 Environmental / Shoring Hazard — Hazardous abatement or complex structural shoring required
5. Other Notes
6. 🚦 Resolve Master Gate Status
Consolidate the findings from all four constructability domains and render the binding Master Gate decision for this pre-construction milestone.
Review the prior sections: Logistics, Drawing Clashes, Schedule/Long-Lead, and Safety. Your selection governs whether the estimating team immediately advances to Quantity Take-Offs and scope breakdown, holds for critical engineering clarifications, or bypasses detailed review.
Evaluate the decision criteria:
Select the overall Master Gate status below and state the binding operational rationale, including mandatory conditions or hold requirements.
- 🟢 Approved — Proceed to RFI Submission & Take-Offs
- 🟡 Approved with Conditional RFIs — Proceed with Take-Offs
- ⚪ Skipped — Minor Project / Repeat Prototype Plan
- 🔴 Blocked — Hold Take-Offs Until Key RFIs / Redesigns Resolved
7. Photos or files
📅 3.1 Subcontractor Bid Leveling Alignment Meeting.
5 stepsReview and level trade subcontractor bids side-by-side with Estimating, Project Management, Procurement, and Field Operations. Reconcile scope inclusions and exclusions, evaluate bidder safety and schedule commitments, and formally authorize trade awards before issuing subcontract agreements. During the meeting, each team member brings their pre-meeting work to answer their specific part of the puzzle: Lead Estimator: Demonstrates whether the bid is financially balanced, covers the full CSI scope, and fits within the baseline estimate. Project Manager: Confirms if the subcontractor can meet the critical path schedule and hit key submittal deadlines. Procurement Specialist: Confirms if the bidder passed safety (OSHA), insurance, and bonding checks. Field Superintendent: Confirms whether the sub has the actual crew size and field logistics capability to pull it off on-site.
- 1
📋 Does the selected subcontractor have a 100% complete scope with zero unassigned gaps, and are their prequalifications (safety, bonding, and capacity) fully verified?
- 2
📋 Does this bid fit within the target budget and schedule milestones—and if selecting a non-cheapest bidder, what is the clear operational justification?
- 3
Meeting Notes
- 4
🚦 Establish Bid Leveling Status & Final Decision Log
- 5
Subcontractor Award & Bid Leveling Decision Summary - Document
Read the full text
1. 📋 Does the selected subcontractor have a 100% complete scope with zero unassigned gaps, and are their prequalifications (safety, bonding, and capacity) fully verified?
- 🔴 Scope Gaps Identified (Unassigned Line Items)
- 🟡 Scope Complete (Pending Prequalification Docs)
- 🟢 Scope Complete & Fully Prequalified
2. 📋 Does this bid fit within the target budget and schedule milestones—and if selecting a non-cheapest bidder, what is the clear operational justification?
- 🔴 Over Budget / Schedule Risk (Requires Re-Bidding or Value Engineering)
- 🟡 Higher Bid Selected (Justification Documented)
- 🟢 Lowest Qualified Bid (Within Budget & Schedule)
3. Meeting Notes
4. 🚦 Establish Bid Leveling Status & Final Decision Log
Provide a brief summary in the comment box detailing the selected subcontractor, pricing tier, justification, and any open contingencies or immediate actions required before contract generation.
Copy, paste, and complete the template below into the session comment box:
TRADE DIVISION: 06-100 — Rough Carpentry / Framing
Selected Trade Partner: [ Apex Framing Co. ]
Pricing Tier: ( ) Lowest Bid (•) Higher-Priced Bid
Award Justification: Guaranteed 2-week faster schedule
Final Contract Value: $245,000.00
- 🟢 Bids Leveled & Selected — Ready for Award Approval
- 🟡 Conditional Selection — Pending Final Scope / Price Clarification with Sub
- 🟠 Scope Gap / Cost Overrun — Re-bidding or Value Engineering Required
- 🔴 Blocked — Insufficient Prequalified Bidders (Fewer than 3 Bids)
5. Subcontractor Award & Bid Leveling Decision Summary - Document
Turn the notes from the final decision step into a 1–3 page document that includes the selected trade division and subcontractor, their pricing, justification, open contingencies, actions required before contract generation, and any notes worth considering during contract creation. Create a table.
📅 3.2 Executive Buyout & Risk Approval
2 stepsReview the compiled project estimate, risk contingency reserves, and prime contract legal liabilities with leadership and estimating. Verify margin thresholds and risk allocations to establish our final binding bid release decision. Required Attendees General Contractor Executive (VP of Operations / Owner / Managing Director) Chief Estimator Lead Project Manager Meeting objective: The objective is to get executive sign-off on the full project numbers before legally binding the company.
- 1
Review the following documents
- 2
🚦 Resolve Proposal Release Status
Read the full text
1. Review the following documents
Find all documents below.
2. 🚦 Resolve Proposal Release Status
Select the formal executive resolution status for this project based on the margin verification, contingency audit, and contractual review.
What Gets Evaluated & Decided?
State the specific rationale, required financial or margin adjustments, and any mandatory contract riders directly in your selection comment:
- 🟢 Approved — Execute Prime Contract & Release Subcontracts
- 🟡 Conditional Approval — Adjust Margin / Contingency & Re-Submit
- 🔴 Rejected — High Financial Risk / Scope Overrun (Contract Holds Required)
📅 4.1 Internal Project Handoff Meeting
20 stepsThe Estimator walks the operational team through the project scope, estimate, schedule baseline, and trade awards step-by-step. Who Attends: Lead Estimator, assigned Project Manager, assigned Field Superintendent, and (optionally) the Executive/Director. Create: Trande-by-trade package. Buyout & Handover Binder (or Digital Folder) organized by CSI MasterFormat divisions (e.g., Concrete, Framing, MEP, Finishes). For each trade division, the PM and Superintendent receive: The Winning Subcontractor Proposal: Final scope sheet and contract amount. The Bid Leveling Matrix: Showing all trade partners who bid, their side-by-side pricing, and why the winner was selected. Scope Boundary & Interface Notes: Explicit mentions of gray-area responsibilities (e.g., "Framing sub is responsible for layout; Drywall sub is responsible for daily jobsite trash removal"). Open Contingencies & Long-Lead Items: Outstanding prequalification items (like missing COIs or bonds) and material lead times that threaten the schedule
- 1
Todays meeting: Select a trade.
- 2
Package Handoff & Scope Briefing
- 3
Package Handoff & Scope Briefing
- 4
Package Handoff & Scope Briefing
- 5
Package Handoff & Scope Briefing
- 6
Package Handoff & Scope Briefing
- 7
Package Handoff & Scope Briefing
- 8
Package Handoff & Scope Briefing
- 9
Package Handoff & Scope Briefing
- 10
Package Handoff & Scope Briefing
- 11
Package Handoff & Scope Briefing
- 12
Package Handoff & Scope Briefing
- 13
Package Handoff & Scope Briefing
- 14
Package Handoff & Scope Briefing
- 15
Package Handoff & Scope Briefing
- 16
Package Handoff & Scope Briefing
- 17
Package Handoff & Scope Briefing
- 18
Package Handoff & Scope Briefing
- 19
Package Handoff & Scope Briefing
- 20
Generate PM & Superintendent Action Summaries
Read the full text
1. Todays meeting: Select a trade.
Package Handoff: [ Folder Link]
Select the trade to discuss today and verify that the final package transfer is complete. If any information is missing, note it below; outstanding details will be provided within 2 days.
- 🧹 01 00 00 — General Conditions & Site Logistics: Site cleanup, temporary utilities, dumpsters, and site security.
- 🚜 02 00 00 — Sitework & Earthwork: Demolition, excavation, grading, utility trenching, and paving.
- 🧱 03 00 00 — Cast-in-Place Concrete: Footings, foundation slabs, grade beams, and structural concrete pouring.
- 🧱 04 00 00 — Masonry: CMU block walls, brick veneer, stone installation, and mortar work.
- 🏗️ 05 12 00 — Structural Steel & Metals: Steel beams, columns, metal decking, stairs, and structural welding.
- 🪵 06 11 00 — Framing & Rough Carpentry: Wood/metal stud framing, roof trusses, floor joists, and structural sheathing.
- 🪴 06 20 00 — Finish Carpentry & Millwork: Interior trim, baseboards, custom cabinetry, doors, and hardware.
- 🛡️ 07 21 00 — Thermal & Moisture Protection: Insulation, waterproofing, flashing, and roofing systems.
- 🪟 08 50 00 — Doors, Windows & Glazing: Storefront glass, exterior windows, skylights, and door hardware.
- 🦺 09 22 00 — Drywall & Gypsum Board: Wallboard installation, metal studs, taping, plastering, and joint finishing.
- 🪨 09 30 00 — Tile & Stone: Ceramic, porcelain, stone flooring, splashbacks, and wet area waterproofing.
- 🪵 09 64 00 — Hardwood & Resilient Flooring: Hardwood, LVT, vinyl, carpet, and subfloor prep.
- 🎨 09 90 00 — Painting & Wallcoverings: Interior/exterior paint, primers, caulking, stains, and wall finishes.
- 🚰 22 10 00 — Plumbing & Piping: Underground rough-in, gas lines, water pipes, drain systems, and fixtures.
- ❄️ 23 31 00 — HVAC & Climate Systems: Ductwork, air handlers, condensers, exhaust fans, and thermostats.
- ⚡ 26 05 00 — Electrical & Low Voltage: Main service panels, conduit, wiring, lighting fixtures, fire alarms, and data wiring.
- 🚒 21 10 00 — Fire Suppression: Overhead sprinkler mains, drops, heads, and fire pump systems.
- 🌳 32 90 00 — Landscaping & Irrigation: Planting, sod, irrigation lines, hardscaping, and site retaining walls.
2. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
3. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
4. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
5. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
6. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
7. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
8. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
9. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
10. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
11. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
12. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
13. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
14. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
15. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
16. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
17. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
18. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
19. Package Handoff & Scope Briefing
The Estimator delivers the complete estimating binder, master schedule, and baseline budget to the PM and Superintendent.
- 🔴 In Progress — Awaiting Final Package Transfer
- 🟢 Complete — Handoff Package Received & Reviewed
20. Generate PM & Superintendent Action Summaries
✅ 5.1 Permitting & Utility Checklist
1 stepComplete and track all mandatory site mobilization prerequisites including building permits, municipal approvals, temporary utility hookups, and subcontractor insurance coverage. Assign owners and confirm status before heavy equipment delivery or full field mobilization begins.
- 1
✅ Complete Site Mobilization Compliance Checklist
Read the full text
1. ✅ Complete Site Mobilization Compliance Checklist
Review and execute the mandatory compliance prerequisites required prior to authorizing full jobsite mobilization and equipment drop-off.
Unresolved jurisdictional approvals or missing utility interconnections create catastrophic delays, stop-work orders, and liability exposure. Verify each requirement against current project records:
Check off each item, attach supporting documentation or inspection sign-offs directly to the task, and log any open compliance holds in the task notes.