Field Operations Milestone & Gate Approval Process
Field execution framework that replaces repetitive checklists with strict 3-stage Decision Gates...
- Sessions
- 15
- Steps
- 53
- Last edited
- Oct 25, 2026
- Created by
- Nova
About this process
A standardized, 4-phase field execution framework that replaces repetitive checklists with strict 3-stage Decision Gates (Document Request > Trade Handoff Huddle > Field Validation) across major structural milestones to guarantee quality, enforce trade accountability, and eliminate costly rework.
The process in detail
15 sessions ยท 53 steps๐ Meetings-Notes
2 steps- 1
Meeting Notes.
- 2
To-do list
Read the full text
1. Meeting Notes.
2. To-do list
๐ Progress Billing & Application for Payment
6 stepsExecute the monthly client progress billing workflow by auditing on-site progress against the Schedule of Values, reconciling trade pay applications and lien waivers, and compiling the AIA G702/G703 billing package. Submit the complete application with photographic backup for architect certification and client disbursement.
- 1
Audit Physical Progress Against SOV
- 2
Reconcile Subcontractor Applications & Waivers
- 3
Upload Progress Photos & Delivery Slips
- 4
Compile AIA G702 & G703 Application Package
- 5
Verify Billing Quality & Compliance Gates
- 6
Approve & Issue Payment Package
Read the full text
1. Audit Physical Progress Against SOV
Conduct the end-of-month physical progress walk across all active trades to confirm percentage-of-completion before drafting billing figures.
Evaluate physical work in place against the approved Schedule of Values (SOV) line items. Overbilling without field verification triggers architect rejections, pencil-copy disputes, and cash flow delays.
Apply standard progress calculation logic:
Mark the audit status for each trade phase to ensure complete field alignment prior to compiling pay applications.
- โ Field progress verified against SOV line items
- โ ๏ธ Discrepancy noted between trade claim and physical installation
- ๐ฆ Stored materials inspected and documented on site
- ๐ Pencil copy draft reviewed with Project Superintendent
2. Reconcile Subcontractor Applications & Waivers
Review each active trade contractor's monthly payment application against inspected field progress and verify legal compliance documents.
Never advance a subcontractor billing line into the prime billing package without verifying both the math and statutory lien releases:
Record any required downward adjustments or missing lien waivers in the log below so adjustments can be reflected on the draft G703.
3. Upload Progress Photos & Delivery Slips
Attach date-stamped photographic evidence and delivery documentation supporting every major progress milestone claimed this cycle.
Architects, owners' representatives, and bank draw inspectors require clear visual proof before certifying payment applications:
Add all supporting visual documentation and delivery slips here.
4. Compile AIA G702 & G703 Application Package
Assemble the formal AIA Document G702 (Application and Certificate for Payment) and AIA Document G703 (Continuation Sheet).
Verify the core accounting reconciliation across all summary lines on the G702 summary page:
Upload the compiled draft PDF of the G702 and G703 forms, accompanied by the notarized signature sheet.
5. Verify Billing Quality & Compliance Gates
Execute the final quality control gate to verify that every legal, mathematical, and contractual requirement is fulfilled prior to release.
Work through the standard GC payment compliance checks:
Confirm each verification item below.
- ๐งฎ G702 and G703 mathematical reconciliation confirmed
- ๐ Notarized contractor signature executed on G702
- ๐ All active trade conditional lien waivers collected
- ๐ธ Photographic audit package attached to submittal
- ๐ Change order summary aligns with executed contract modifications
6. Approve & Issue Payment Package
Authorize the final submission of the monthly Application and Certificate for Payment to the Project Architect and Client.
Review the assembled package:
Approve to release the official draw submittal to the design team and ownership, or decline with specific correction notes regarding discrepancies in SOV percentages, lien documentation, or calculations.
- Approve
- Request changes
- Decline
1. Site Mobilization & Safety Setup
6 stepsVerify jobsite infrastructure, establish safety and environmental controls, and conduct the trade orientation kickoff. Complete these verification steps to authorize heavy equipment delivery and initial trade crew mobilization.
- 1
Verify Temporary Utilities & Site Infrastructure
- 2
Audit Environmental Controls & Stormwater
- 3
Post OSHA Signage & Safety Stations
- 4
Document Trade Superintendent Kickoff Meeting
- 5
Execute Pre-Mobilization Action Items
- 6
Authorize Site Mobilization & Trade Access
Read the full text
1. Verify Temporary Utilities & Site Infrastructure
Establish physical perimeter control and temporary utility connections before allowing field operations to commence.
Inspect each infrastructure element against local municipal building codes and OSHA standards:
Select your current infrastructure verification status and note any utility provider lead times or inspection delays.
- ๐๏ธ All Utilities & Security Fencing Active
- โณ Pending Utility Meter Connection
- โ ๏ธ Fencing or Sanitary Incomplete
- ๐ No Site Infrastructure In Place
2. Audit Environmental Controls & Stormwater
Review and activate the project's Stormwater Pollution Prevention Plan (SWPPP) and site environmental mitigation controls.
Ensure all mandated regulatory safeguards are active prior to earthwork or site disturbance:
Document any field variances or municipal SWPPP permit conditions that require daily logging.
3. Post OSHA Signage & Safety Stations
Verify all mandatory federal, state, and local safety compliance stations are mounted and accessible across the field office and jobsite entry gates.
Inspect against this life-safety standard:
Indicate compliance status for site life-safety setup.
- ๐ฆบ 100% OSHA Signage & Medical Stations Ready
- ๐ SDS Binder or Posters Pending Update
- ๐งฏ Fire Extinguishers / First Aid Deficient
- ๐ Safety Compliance Walk Failed
4. Document Trade Superintendent Kickoff Meeting
Conduct the mandatory on-site mobilization kickoff meeting with all contracted trade superintendents, foremen, and project engineers.
Walk through these critical coordination topics:
Log the meeting minutes, record attending trade companies and superintendents, and list all agreed jobsite logistics agreements here.
5. Execute Pre-Mobilization Action Items
Complete all assigned operational tasks before clearing subcontractors to bring machinery or full labor crews onto the site.
Assign specific team owners and firm due dates to ensure zero regulatory or physical bottlenecks remain.
6. Authorize Site Mobilization & Trade Access
Issue the formal determination on site readiness for full trade mobilization.
Review the preceding verifications: temporary utilities energized, perimeter secured, SWPPP sediment controls trenched, OSHA compliance stations mounted, and trade kickoff orientations conducted.
Select the authorized site access level. Use the comment box to specify any conditional holdbacks (e.g., Site cleared for framing and excavation crews; mechanical rough-in staging restricted until east laydown pad gravel cures).
- ๐ข Full Mobilization Authorized (Unrestricted Site Access)
- ๐ก Conditional Mobilization (Specific Trades Only)
- ๐ด Site Mobilization Denied (Safety / Utility Hold)
๐ Daily Execution & Quality Assurance Inspections
5 stepsLog your daily field operations, morning safety briefings, trade inspections, and photo documentation directly in this session. Your submissions create the verified chronological record of job site progress, subcontractor quality control, and pre-concealment sign-offs.
- 1
๐ฆบ Conduct Morning Toolbox Talk
- 2
๐ Log Daily Site Conditions & Headcounts
- 3
๐ Audit In-Progress Trade Work
- 4
๐ธ Verify Pre-Concealment Photo Records
- 5
๐ Execute Daily Field Closeout Tasks
Read the full text
1. ๐ฆบ Conduct Morning Toolbox Talk
Run the mandatory morning safety and production stand-up with all active trade foremen prior to work commencing.
Brief the specific high-risk operations scheduled for today (such as hot work, overhead lifting, trenching, or leading-edge fall protection), verify required Personal Protective Equipment (PPE) compliance across all crews, and confirm site logistics including crane delivery staging and material drop zones.
Select the primary safety focus addressed during this morning's briefing:
- ๐ฆบ Fall Protection & Scaffolding
- โก Electrical Safety & Lockout/Tagout
- ๐ Trenching, Excavation & Heavy Equipment
- ๐ฅ Hot Work, Fire Watch & Burn Permits
- ๐งค PPE, Silica Dust & Chemical Handling
- ๐ฆ Overhead Hazards, Rigging & Crane Logistics
2. ๐ Log Daily Site Conditions & Headcounts
Record the official job site operational parameters to establish a verifiable legal and contractual record of daily site activity.
Capture the following operational baseline:
Provide your comprehensive daily operational notes below.
3. ๐ Audit In-Progress Trade Work
Inspect ongoing trade work against approved construction submittals, architectural and structural drawings, and manufacturer installation specifications.
Evaluate current installations across these core quality dimensions:
Identify any deviations, non-conforming items, or defective workmanship. Record the trade responsible, grid line or room location, specific code/plan discrepancy, and the mandatory corrective action required within 24 hours.
4. ๐ธ Verify Pre-Concealment Photo Records
Capture photographic proof of all mechanical, electrical, plumbing, structural framing, and waterproofing work before it is permanently concealed by insulation, drywall, backfill, or concrete pours.
High-resolution pre-concealment documentation prevents future warranty disputes and provides clear evidence of code compliance for municipal building inspectors and owners.
Upload clear photos of all in-wall rough-ins, above-ceiling mechanical rough-ins, under-slab conduits, and waterproofing membranes prior to sign-off. Ensure photos capture room markers, grid references, and backing plates.
5. ๐ Execute Daily Field Closeout Tasks
Complete the end-of-day site protocol to ensure physical security, environmental compliance, and complete accountability before trade crews depart the property.
Assign and verify the mandatory end-of-day site handover items:
1.2. Compliance Review & Pre-Pour Checklist
2 steps- 1
Key Deliverables & Compliance Review
- 2
Compliance: Pre-Pour Checklist
Read the full text
1. Key Deliverables & Compliance Review
2. Compliance: Pre-Pour Checklist
A 6-item visual gate executed on-site by the Field Superintendent via tablet:
- โ Underground plumbing pressure test passed ($150\,\text{psi}$ held for 30 minutes).
- โ Electrical conduit sweeps and stub-ups verified against floor plans.
- โ Rebar clearance (2 inches minimum from earth) and lap splash verified.
- โ Formwork dimensioned, squared, and braced for hydrostatic concrete pressure.
- โ Structural Engineer special inspection clearance signed.
- โ Municipal building inspector signed the physical job-site permit card.
๐ 1.3. Review Meeting (site walk)
5 steps- 1
Critical Items to Review During the Walk
- 2
Concrete Truck Authorization: Is the site 100% cleared to call the concrete plant and confirm truck delivery times?
- 3
Where do the pump trucks park, in what order are sections poured, and who is directing traffic/washouts?
- 4
Additional notes.
- 5
Decision Gate Sign-Off
Read the full text
1. Critical Items to Review During the Walk
Please go over this checklist.
- โ Excavation & Subgrade: Soil cleanliness (no mud, standing water, or debris in trenches) and compaction sign-off.
- โ Formwork & Layout: Form lines, squareness, elevation datum points, and bracing stability to withstand concrete pressure.
- โ Rebar & Structural Steel: Lap splices, rebar size/spacing, corner ties, and clearance chairs (ensuring rebar sits at least $2\text{ in}$ above earth).
- โ Underground MEP Stub-ups: Location, plumbness, and elevation of plumbing drain pipes, water mains, and electrical conduits exiting the slab.
- โ Sleeve & Penetration Locations: Utility wall sleeves and anchor bolt placement against architectural grids.
2. Concrete Truck Authorization: Is the site 100% cleared to call the concrete plant and confirm truck delivery times?
- Yes
- No
3. Where do the pump trucks park, in what order are sections poured, and who is directing traffic/washouts?
4. Additional notes.
If minor items fail (e.g., a missing rebar tie or displaced conduit), who fixes it, and is a photo sign-off permitted before the first truck arrives?
5. Decision Gate Sign-Off
- ๐ด Hold โ Engineering or Subgrade Failure
- ๐ก Conditional Hold โ Minor Fix Required (Re-Inspect before Pour)
- ๐ข Approved โ Permission to Pour Concrete Granted
2.3 Field Validation & Work Verification Checklist
4 stepsInspect the building envelope, complete physical verification of roofing, waterproofing, windows, and framing, and log your field observations. Your verification determines whether the building is watertight and cleared for interior trade mobilization.
- 1
Validate Roofing and Waterproofing Systems
- 2
Verify Exterior Openings and Framing
- 3
Upload Field Inspection Photos
- 4
Issue Watertightness Gate Determination
Read the full text
1. Validate Roofing and Waterproofing Systems
Conduct a comprehensive physical walk of the roof deck and perimeter terminations before clearing trades beneath this scope.
Inspect every penetration, seam, and critical transition using the checklist criteria below:
Select all inspection checkpoints verified and sound. Note any punch items requiring remedial torch work or sealant in the comment box.
- โ Membrane seams and edge terminations inspected
- ๐ Roof drains and overflow scuppers clamped and clear
- ๐งฑ Parapet counter-flashing embedded and sealed
- ๐ง Flood or hose spray test passed without leaks
2. Verify Exterior Openings and Framing
Inspect the exterior building envelope penetrations, drainage planes, and structural lateral framing prior to insulation or drywall loading.
Verify compliance with structural details and building science water-shedding principles:
Mark each structural and weather-barrier requirement confirmed on site. Record any trade coordination conflicts or missed fasteners.
- ๐ช Window pan flashings sloped with clear weeps
- ๐ก๏ธ Weather-resistive barrier shingled and taped
- ๐ฉ Structural shear nailing and hold-downs verified
- ๐ชต Framing headers and hurricane clips inspected
3. Upload Field Inspection Photos
Provide date-stamped photographic verification of critical flashing details, flood testing water levels, window sill pans, and shear wall nailing.
High-resolution visual evidence serves as permanent quality documentation for the project closeout file, design team review, and warranty validation.
Upload your site inspection images or manufacturer inspection sign-off sheets directly here.
4. Issue Watertightness Gate Determination
Evaluate the cumulative field observations, water testing results, and framing checks to issue the formal envelope milestone determination.
Selecting a status establishes trade readiness:
Select the project status and document your superintendent sign-off notes and required follow-up deadlines in the rationale comment.
- ๐ด Hold โ Envelope Leaks or Framing Defect
- ๐ก Conditional Approval โ Minor Touch-Ups Required
- ๐ข Approved โ Building Watertight and Cleared
๐ 2.1 Trade Handoff Meeting
2 steps- 1
On-site walkthrough Agenda
- 2
Notes
Read the full text
1. On-site walkthrough Agenda
- Roofing & Envelope Handoff: Trade foreman presents finished roof membrane, flashing, drains, and exterior wall wraps.
- Critical Transitions: Review complex joints (roof-to-wall flashing, window pan flashing, skylight curbs).
- Outstanding Scope: Identify any open trim or temporary sealant details before water testing.
2. Notes
2. Sub Document Request
5 stepsSubmit your complete roofing warranty package, technical cut sheets, notice of completion, and executed self-inspection QA checklist. Our project engineering and superintendent team will review your submittals to verify compliance and determine readiness for the punch walk and final closeout handoff.
- 1
๐ Upload Roofing Warranty Documents
- 2
๐ Submit Notice of Completion
- 3
โ Upload Signed QA Self-Inspection
- 4
๐ Audit Closeout Documentation
- 5
โ๏ธ Determine Submittal Package Status
Read the full text
1. ๐ Upload Roofing Warranty Documents
Upload the formal manufacturer warranty certificate, contractor workmanship warranty, and technical product cut sheets for all installed roofing materials.
Ensure the warranty package explicitly reflects:
Attach all PDF documents below.
2. ๐ Submit Notice of Completion
Submit the signed and notarized Notice of Completion for all contracted roofing and waterproofing scope.
Before uploading, verify the following details:
Upload the signed document file directly below.
3. โ Upload Signed QA Self-Inspection
Upload your completed and signed Roofing Subcontractor Quality Assurance / Quality Control Self-Inspection checklist.
In accordance with project quality standards and field validation requirements, your self-inspection record must show:
Upload the scanned or digital inspection record below.
4. ๐ Audit Closeout Documentation
Verify that the subcontractor's submittal package meets all project specifications, manufacturer warranty prerequisites, and contract requirements.
Evaluate the submitted package against these four criteria:
Document any missing attachments, discrepancies, or technical exceptions in your notes below.
5. โ๏ธ Determine Submittal Package Status
Evaluate the roofing trade's submitted warranty package and select the formal determination.
Choose the applicable review determination based on package completeness:
Provide your review findings, outstanding conditions, or next meeting instructions in your comment.
- โณ Incomplete - Awaiting Trade Handoff Docs
- ๐ Ready - Package Approved & Walkthrough Scheduled
3.1 Document Request Gate
5 stepsAdd all required municipal rough certificates, trade pressure test logs, and approved in-wall change orders directly into the project folder. Complete each verification check below to confirm all documentation has been audited prior to authorizing drywall and wall concealment.
- 1
Create a main folder for the following documents
- 2
๐ File Municipal Rough Certificates
- 3
๐ File Hydrostatic & Pressure Logs
- 4
๐ File In-Wall Change Orders
- 5
๐ Release Wall Concealment Clearance
Read the full text
1. Create a main folder for the following documents
Add link below
2. ๐ File Municipal Rough Certificates
Ensure signed municipal building inspection cards are fully verified and added directly to the official project document folder under MEP Rough-Ins.
Every jurisdiction requires explicit sign-offs before any wall cavities are closed. Audit each permit card for an official inspector signature, date, and unconditional "Pass" status across:
Confirm that all four cards are verified and added to the folder.
- โ All 4 rough certificates verified and in folder
- โ ๏ธ Partial pass (conditional reinspection required)
- โ Missing municipal inspector sign-offs
3. ๐ File Hydrostatic & Pressure Logs
Verify that all specialized trade pre-concealment test logs are completed, signed by trade foremen, and placed into the project document folder.
Concealing unverified pressure lines creates severe water damage and air leakage risks behind finished drywall. Check that the uploaded documentation includes:
Verify the test certificates and log your confirmation below.
- โ Hydrostatic & duct pressure logs verified in folder
- โ ๏ธ Test logs incomplete or missing foreman signature
- โ Test failures recorded (re-test pending)
4. ๐ File In-Wall Change Orders
Verify that all scope adjustments, owner changes, and field condition revisions inside wall assemblies are fully costed, approved, and filed in the project folder.
Drywalling over unauthorized or unpriced in-wall rough-ins leads to unrecoverable backcharges and rework disputes. Ensure:
Confirm change order documentation status before proceeding to trade release.
- โ All in-wall change orders approved and in folder
- โ ๏ธ Open change directives pending PM cost sign-off
- โน๏ธ No in-wall change orders on this phase
5. ๐ Release Wall Concealment Clearance
Review the status of municipal certificates, trade pressure tests, and approved change orders in the project folder to issue the final drywall authorization.
Execute the following verification checklist before releasing drywall crews into the zone:
๐ 3.2 Trade Handoff Meeting
2 steps- 1
On-site Walkthrough Agenda
- 2
Notes
Read the full text
1. On-site Walkthrough Agenda
- A โ Trade Coordination Walk: Lead walkthrough with MEP foremen to confirm ductwork, piping, and wiring home-runs do not clash or block light fixtures.
- B โ Structural Penetration Review: Verify no trade notched or bored load-bearing studs, floor joists, or truss webs outside engineering specs.
- C โ Architectural Backing Verification: Confirm wood/metal backing is installed for wall-hung cabinets, TV mounts, grab bars, and door stops.
2. Notes
3.3 Physical Field Validation
5 stepsInspect all open wall bays, ceiling cavities, and MEP rough-ins before sheetrock hanging begins. Complete the verification checkpoints, upload as-built cavity scans, and issue the pre-drywall sign-off to ensure zero concealment non-conformances.
- 1
๐ Verify Municipal Rough Sign-Offs
- 2
๐ก๏ธ Audit Penetrations and Mechanical Protection
- 3
๐ธ Capture Cavity As-Built Media
- 4
โ ๏ธ Log Pre-Drywall Punch Items
- 5
๐ฆ Authorize Pre-Drywall Close-In
Read the full text
1. ๐ Verify Municipal Rough Sign-Offs
Confirm all required jurisdictional inspections have been officially signed off and posted on-site before authorizing drywall stocking or hanging.
Review the physical permit card and municipal inspection portal to confirm zero open re-inspection notices:
Check each municipal discipline verified on the official inspection card. Use the comment box to record permit numbers and inspector sign-off dates.
- โก Electrical rough passed & signed
- ๐ง Plumbing rough passed & signed
- โ๏ธ Mechanical/HVAC rough passed & signed
- ๐ชต Framing structural rough passed & signed
2. ๐ก๏ธ Audit Penetrations and Mechanical Protection
Walk every open stud bay and plenum track to verify physical protection against mechanical puncture and fire/smoke migration.
Apply these code and quality standards:
Select the safety and penetration controls confirmed in the field. Add notes detailing any bays requiring trade back-check.
- ๐ฅ Fire-stopping sealed at all floor/ceiling penetrations
- ๐งฑ Mineral wool draft-stopping complete in chases
- ๐ก๏ธ Steel nail plates installed on all offset routings (<1.25 in)
- ๐ Cabling secured and protected from sharp metal edges
3. ๐ธ Capture Cavity As-Built Media
Upload complete 360-degree photo or video documentation of all open wall cavities, chases, and ceiling rough-ins prior to drywall hanging.
Documenting pre-concealment conditions provides permanent as-built evidence for facility management, future tenant improvements, and warranty defect defense.
Ensure your visual captures include:
Upload the full room scan video files, photo log, or direct cloud links to the 360-degree capture repository below.
4. โ ๏ธ Log Pre-Drywall Punch Items
Record any deficiencies, unverified rough-ins, or damage caused by adjacent trades that must be rectified before hanging sheetrock.
Use this format for each logged observation:
Post each punch item as an entry below. React with ๐ง when corrective work is underway, and โ once reinspected and verified clear.
5. ๐ฆ Authorize Pre-Drywall Close-In
Evaluate total rough-in inspection compliance and determine whether interior trades are authorized to hang drywall and conceal cavities.
Make your final field authorization based on the criteria below:
Select the project status and provide your sign-off rationale in the comments.
- ๐ข Approved for Drywall: Cavities released for full hang
- ๐ก Conditional Approval: Specific minor items cleared prior to hang
- ๐ด Hold: Concealment blocked until reinspection
4.1 Document Request Gate
2 steps- 1
Internal tasks
- 2
๐ Upload Closeout & Certificate of Occupancy Documents
Read the full text
1. Internal tasks
2. ๐ Upload Closeout & Certificate of Occupancy Documents
Upload the architectural punch list, third-party balancing/commissioning reports, and the municipal Certificate of Occupancy prior to final owner sign-off.
๐ 4.2: Trade Handoff Meeting
2 steps- 1
On-site Walkthrough Agenda
- 2
Notes
Read the full text
1. On-site Walkthrough Agenda
- A โ Architect Punch List Walk: Walk every room with the Architect and Client Representative to log cosmetic and finish deficiencies.
- B โ Owner System Demonstration: Conduct operational handoff walk showing client facility staff how to operate main disconnects, HVAC thermostats, and water shutoffs.
- C โ Final Financial & Scope Alignment: Review completed change orders, retainage release requirements, and warranty binder delivery dates